The EVT45 Maxi Charger Dual Pillar is a compact, heavy-duty mounting solution for dual Sevadis Maxi charger installations, built for commercial, workplace, fleet and shared parking environments where installation speed, presentation and long-term consistency matter.
Where the EVT45 really stands apart is the option to supply the pillar with pre-built electrical enclosure assemblies. Instead of relying on every connection being made from scratch on site, EV Tower can prepare the enclosure work in a controlled workshop environment, supporting cleaner wiring, more consistent terminations and a repeatable build standard across multi-bay projects.
For installers, this can mean less time spent wiring in car parks, fewer variables caused by weather, access and site pressure, and a more efficient route to a professional finished installation. The pre-built option is especially valuable on rollouts where multiple pillars need to be installed to the same standard, helping reduce time on site while improving confidence in the finished assembly.
The EVT45 features an enclosed matt black RAL9005 pillar body with removable side panels, internal mounting space and practical cable routing. At 1197mm high, 392mm wide and 270mm deep, with an approximate mass of 30kg, it provides a robust, space-efficient platform for dual Maxi charger installations.
Key Features:
Designed for dual Sevadis Maxi charger installations
- Heavy-duty enclosed pillar design
- Compact footprint: 1197mm high x 392mm wide x 270mm deep
- Approximate mass: 30kg
- Matt black RAL9005 powder-coated finish
- Internal mounting space for a clean installation
- Removable side panel assembly for improved access
- Includes pillar tower assembly, side panel assemblies and top plate assembly
- Suitable for commercial, workplace, fleet and shared parking EV charging sites
- Supports a neat, professional charger presentation
Pre-Build Support:
Most site work is exposed to variables: weather, access, lighting, available working space, programme pressure and the natural variation between installers. The EVT45 pre-built option helps reduce those variables by allowing key enclosure work to be prepared before the product reaches site.
This gives contractors and project teams a cleaner, more scalable way to deliver commercial EV charging infrastructure, especially when several pillars are being installed together.
Why Choose the Pre-Built Option?
Choose the EVT45 pre-built option to reduce installation time and improve consistency across your EV charging project. By preparing key enclosure assemblies in a controlled environment, EV Tower helps reduce the amount of on-site wiring required and supports a cleaner, more repeatable installation. This is particularly useful for commercial rollouts where multiple chargers need to be installed quickly, neatly and to a consistent standard.